The Challenge
School roofs varied: 1 was south-facing slate (ideal), 2 were east-west asbestos requiring replacement. Tight summer-holiday-only install window.
Our Solution
50 kWp split across the south-facing school as priority. Asbestos replacement and 30 kWp install scheduled for July break. Education monitoring screens in each school for STEM curriculum tie-in.
The Result
All systems live by start of September term. Schools using monitoring data in classroom (year 6 maths). 4.2 year post-grant payback.