Greater Manchester4 miles from HQ

SolarInstallationinSwinton

120+ Installations3.4 hrs/day avgPop. ~45,000

£240,000

Avg House Price

~19,000

Households

850-900 kWh/kWp/yr

Solar Yield

2038

Net Zero Target

Why Solar Works in Swinton

Swinton hosts Salford's Civic Centre — the competition-winning 1938 building by RIBA Gold Medallist Percy Thomas, now fitted with rooftop solar as part of the council's decarbonisation drive. The town's interwar semi stock across Moorside and Wardley is prime one-day install territory, and the council's depot solar car ports nearby generate 575,000+ kWh a year.

Swinton is Salford's civic heart — home to the competition-winning 1938 Civic Centre — and sits about 4 miles from our depot. Interwar semis dominate Moorside and Wardley, with Victorian stock around Pendlebury's Grade I "miners' cathedral".

120+ Installations

Completed in Swinton

MCS Certified

All engineers accredited

2-4 Week Lead Time

From survey to install

4 miles

From our Salford HQ

Solar installation in Swinton

Swinton Solar Potential

Solar Yield

850+

kWh per kWp per year

3.4 hrs/day avg average sunshine. Optimal south-facing, tilted installation.

£0

Average annual saving

Typical Swinton household with 4kWp system

2038

Net zero target

Swinton council climate commitment

Planning in Swinton

Planning Considerations

St Augustine's, Pendlebury (Bodley, 1871-74) — the Grade I "miners' cathedral" — anchors one of Salford's 16 conservation areas; St Peter's Church (G.E. Street, 1868-69) is Grade II*. Standard permitted development applies across most of Swinton's interwar stock. Salford targets carbon neutrality by 2038; the Solar Together group-buying scheme (now Switch Together) is open to residents.

Areas We Cover in Greater Manchester

Swinton Town CentreMoorsideWardleyCliftonPendleburyNewtownDeans

Postcode Districts Covered

All verified postcode districts within our Swinton service area

M27

Swinton Neighbourhood Profiles

Interwar semi-detached suburbia dominates — Moorside and Wardley are classic 1930s territory — with Victorian terraces around Pendlebury and pockets of newer development at Clifton.

Moorside

M27 0/9

~£260,000

avg price

Classic 1930s bay-fronted semis

Concrete tileEPC D

Unshaded hipped roofs — prime standard-install stock

Wardley

M27 9

~£240,000

avg price

Interwar and post-war semis

Concrete tileEPC D

Pendlebury

M27 4/6

~£200,000

avg price

Victorian terraces near the Grade I St Augustine's

SlateEPC D–E

Sensitive siting near the conservation area; rear elevations preferred

Clifton

M27 6/8

~£230,000

avg price

Post-war estates and modern infill near the M60/M61 junction

Concrete tileEPC C–D

Recent Swinton Case Studies

The council's own town: Salford runs its decarbonisation programme from Swinton's 1938 Civic Centre — itself now solar-fitted — with 1,500+ depot car-port panels generating 575,000+ kWh a year nearby. Four miles from our depot, Swinton's interwar semis are among the most straightforward one-day installs we do.

Moorside

Steve & Lorna P.

3-bed 1930s bay-fronted semi

2026
Solar: 5 kWp on-roof
Battery: 1x Tesla Powerwall 3 (13.5 kWh)
Charger: 7 kW Ohme Home Pro

Annual saving

£1,550/yr

Unshaded hipped roof took 13 panels; Powerwall pushed self-consumption to 84% on Octopus Flux.

Wardley

Angela R.

3-bed post-war semi

2026
Solar: 4.5 kWp on-roof
Battery: 1x EcoFlow PowerOcean (10 kWh)
Charger: None

Annual saving

£1,250/yr

One-day fit with the modular battery in the utility room — sized to add 5 kWh later if an EV arrives.

Pendlebury

Derek H.

Victorian terrace near St Augustine's

2025
Solar: 4 kWp rear-elevation
Battery: 1x EcoFlow PowerOcean (5 kWh)
Charger: None

Annual saving

£980/yr

Rear-roof siting respected the conservation setting of the "miners' cathedral"; slate handled with heritage fixings.

Swinton Solar Costs  2026

Typical fitted prices and payback periods for the dominant property archetypes in Swinton. Every quote is bespoke — these are guideline ranges from recent local installs.

Property archetypeSystem sizeFitted price
Moorside/Wardley interwar semi5-6 kWp on-roof£8,200-£10,800
Pendlebury Victorian terrace (CA-adjacent)4 kWp rear-elevation£7,200-£9,800
Clifton post-war estate + battery5 kWp + 10 kWh battery£11,400-£14,200

Prices include MCS certification, DNO notification (G98/G99), 25-year panel performance warranty, 10/15-year inverter & battery warranty, and full system commissioning. Conservation Area planning consent + pre-application fees passed through at cost.

Council & Community Solar in Swinton

Salford Council's depot solar car ports at Swinton Hall Road (430 panels) and Turnpike (1,145 panels) generate 575,000+ kWh a year, and the Civic Centre roof itself carries solar as part of the council's £7.45m decarbonisation programme.

1,575

Solar panels installed

Swinton Hall Road depot car port

430 panels

Turnpike depot car port

1,145 panels

Salford Civic Centre rooftop

House Prices by Postcode

M27 0/9Moorside & Wardley
£240k-£260k
M27 4/6Pendlebury
£200k
M27 6/8Clifton
£230k

Solar Energy in Swinton

Swinton's property market — centred around an average house price of £240,000 — is spread across approximately ~19,000 households throughout Greater Manchester. The mix of Victorian terraces, pre-war semis, post-war council stock, and modern new builds creates varied installation profiles. Roof pitch, orientation, material, and structural condition all factor into our MCS-compliant system designs, which are produced before each site survey using satellite imagery and then refined on the day by our certified surveyors.

Solar yield in Swinton is approximately 850-900 kWh/kWp/yr kWh per kWp per year, based on 3.4 hrs/day avg of average daily sunshine across Greater Manchester. A south-facing 4kWp system will typically generate 3,300–3,600 kWh annually. Against a household consumption of around 3,500 kWh per year, that represents substantial self-sufficiency — particularly when paired with a battery that shifts daytime generation into peak evening demand. The Smart Export Guarantee (SEG) then pays an additional tariff for every unit you export to the national grid.

Swinton has committed to a net zero target of 2038, and local planning authorities are broadly supportive of solar and heat pump installations under permitted development rights. Homes with renewable energy systems are also increasingly valued: a solar installation with battery storage typically adds 2–4% to property value according to estate agent surveys, while an improved EPC rating directly affects mortgage eligibility and future sale price under incoming MEES regulations.

Energy prices have roughly doubled since 2021, making the financial case for solar generation stronger than at any previous point in the technology's history. A 4kWp system costing £6,000–£7,000 installed and saving £900–£1,200 per year achieves payback within 5–7 years — then continues generating free electricity for 25 or more years. With ECO4 grants available for eligible lower-income Swinton households and 0% VAT on solar and battery equipment, the barriers to entry have never been lower.

Renewable Energy Services in Swinton

Trusted by Homeowners

What Our Clients Say

4.9

Rating

0

Reviews

Battery Storage

Andy gave me great advice about adding a battery to my existing system. He was very knowledgeable and clear. Thanks to all at SMS.

S

Sarah T.

Manchester

Solar Installation

All brilliant from beginning to the end. Professional team who really know their stuff. Would recommend to anyone looking for solar solutions.

J

James R.

London

Maintenance

I received very efficient and helpful service from this company. Especially Jaimie who came when he said he would and was friendly and professional throughout. Can't recommend this company highly enough.

D

David M.

Birmingham

Solar Installation

Fantastic service, super happy and professional with the team. Highly recommend and will use again for any future solar needs.

E

Emma W.

Leeds

Solar Installation

From start to finish the whole process was seamless. The engineers were punctual, tidy, and incredibly knowledgeable. Our energy bills have dropped significantly.

M

Mark P.

Bristol

Trusted By Industry Leaders

Tesla

Certified Installer

EcoFlow

Authorised Dealer

Octopus Energy

Trusted Partner

Phoenix Financial

Finance Partner

MCS Certified

Microgeneration Certification

NICEIC Approved

Electrical Contractor

RECC Member

Renewable Energy Consumer Code

Tesla Powerwall

Certified Installer

EcoFlow Partner

Authorised Installer

Octopus Energy

Trusted Partner

Octopus Energy

Partner of the Year

TSI Approved

Trading Standards Institute

EPVS Registered

PV Scheme Member

IWA Member

Insulated Wall Association

MCS Certified

Microgeneration Certification

NICEIC Approved

Electrical Contractor

RECC Member

Renewable Energy Consumer Code

Tesla Powerwall

Certified Installer

EcoFlow Partner

Authorised Installer

Octopus Energy

Trusted Partner

Octopus Energy

Partner of the Year

TSI Approved

Trading Standards Institute

EPVS Registered

PV Scheme Member

IWA Member

Insulated Wall Association

MCS Certified

Microgeneration Certification

NICEIC Approved

Electrical Contractor

RECC Member

Renewable Energy Consumer Code

Tesla Powerwall

Certified Installer

EcoFlow Partner

Authorised Installer

Octopus Energy

Trusted Partner

Octopus Energy

Partner of the Year

TSI Approved

Trading Standards Institute

EPVS Registered

PV Scheme Member

IWA Member

Insulated Wall Association

Ready for Solar in Swinton?

Join the 120+ homeowners and businesses in Swinton who already benefit from solar energy. Our local Greater Manchester team is ready to design the perfect system for your property.

Solar FAQs for Swinton

In most cases, solar panels in Swinton fall under permitted development rights and do not require planning permission, provided they meet standard size and placement conditions. St Augustine's, Pendlebury (Bodley, 1871-74) — the Grade I "miners' cathedral" — anchors one of Salford's 16 conservation areas; St Peter's Church (G.E. Street, 1868-69) is Grade II*. Standard permitted development applies across most of Swinton's interwar stock. Salford targets carbon neutrality by 2038; the Solar Together group-buying scheme (now Switch Together) is open to residents. Our team handles all necessary applications and compliance checks as part of every installation.