SolarInstallationinCrewe
£178,000
Avg House Price
~24,000
Households
870-920 kWh/kWp/yr
Solar Yield
2045
Net Zero Target
Why Solar Works in Crewe
Crewe is home to Bentley Motors — 36,418 solar panels covering 60,911 sq m (9 football pitches), generating 10MW and supplying 75% of daytime electricity. Includes the UK's largest solar car port (10,000 panels, 2.7MW). Carbon neutral since 2018 (PAS 2060 certified). Leighton Hospital (540 beds) is confirmed for a £1-1.5 billion rebuild starting 2027-2028 — over 60% of the site uses deteriorating RAAC planks. Massive future solar opportunity. Wistaston (£296k) and Nantwich (£290k+) provide the affluent residential market.
Crewe is home to Bentley Motors — 36,418 solar panels covering 60,911 sq m (9 football pitches), generating 10MW and supplying 75% of daytime electricity. Includes the UK's largest solar car port (10,000 panels, 2.7MW). Carbon neutral since 2018. One of the UK's most important rail junctions with 12 platforms.
150+ Installations
Completed in Crewe
MCS Certified
All engineers accredited
2-4 Week Lead Time
From survey to install
35 miles
From our Salford HQ

Crewe Solar Potential
870+
kWh per kWp per year
3.5 hrs/day avg average sunshine. Optimal south-facing, tilted installation.
£0
Average annual saving
Typical Crewe household with 4kWp system
2045
Net zero target
Crewe council climate commitment
Planning in Crewe
Planning Considerations
Part of Cheshire East Council with net zero target 2045. Crewe station has 12 platforms, one of UK's most important junctions on the West Coast Main Line. HS2 Phase 2a cancellation (October 2023) was a blow. Basford East/West combined 1,220+ homes approved with Taylor Wimpey, Lovell, and Goodman active.
Areas We Cover in Cheshire
Postcode Districts Covered
All verified postcode districts within our Crewe service area
Available in Crewe
Every aspect of your renewable energy journey, handled by one local team in Cheshire.
Trusted by Homeowners
What Our Clients Say
4.9
Rating
0+
Reviews
Trusted By Industry Leaders
Tesla
Certified Installer
EcoFlow
Authorised Dealer
Octopus Energy
Trusted Partner
Phoenix Financial
Finance Partner
MCS Certified
Microgeneration Certification
NICEIC Approved
Electrical Contractor
RECC Member
Renewable Energy Consumer Code
Tesla Powerwall
Certified Installer
EcoFlow Partner
Authorised Installer
TSI Approved
Trading Standards Institute
EPVS Registered
PV Scheme Member
IWA Member
Insulated Wall Association
MCS Certified
Microgeneration Certification
NICEIC Approved
Electrical Contractor
RECC Member
Renewable Energy Consumer Code
Tesla Powerwall
Certified Installer
EcoFlow Partner
Authorised Installer
TSI Approved
Trading Standards Institute
EPVS Registered
PV Scheme Member
IWA Member
Insulated Wall Association
MCS Certified
Microgeneration Certification
NICEIC Approved
Electrical Contractor
RECC Member
Renewable Energy Consumer Code
Tesla Powerwall
Certified Installer
EcoFlow Partner
Authorised Installer
TSI Approved
Trading Standards Institute
EPVS Registered
PV Scheme Member
IWA Member
Insulated Wall Association
Ready for Solar in Crewe?
Join the 150+ homeowners and businesses in Crewe who already benefit from solar energy. Our local Cheshire team is ready to design the perfect system for your property.
Solar FAQs for Crewe
In most cases, solar panels in Crewe fall under permitted development rights and do not require planning permission, provided they meet standard size and placement conditions. Part of Cheshire East Council with net zero target 2045. Crewe station has 12 platforms, one of UK's most important junctions on the West Coast Main Line. HS2 Phase 2a cancellation (October 2023) was a blow. Basford East/West combined 1,220+ homes approved with Taylor Wimpey, Lovell, and Goodman active. Our team handles all necessary applications and compliance checks as part of every installation.


.png)


